Sections

Weather Forecast

Close

Photos: Bridging the gap for the new river bridge

Photo by Joni Juliar / RiverTown Multimedia1 / 2
A construction worker examines the deck ends before the final bridge span is placed over the Mississippi River at Red Wing on June 17, 2019. Anne Jacobson / RiverTown Multimedia 2 / 2

Zenith Tech construction worked to secure one of the Red Wing bridge's final deck beams on Monday, June 17, 2019, that arrived via barge and was placed by crane.